properproperty.typepad.com > OFF PLAN: Exclusive Apartments in Przno 072 SBU

« Back to OFF PLAN: Exclusive Apartments in Przno 072 SBU

39

Code: 072 SBU
Type: OFF PLAN: Under construction
Location: Budva-Przno
Area: 50 m2 to 82 m2
Price in EUR: From 3100 to 4300 €/m2
Description: The BLUE HORIZON Apartments are modern glass fronted complex with architectural mix of local stone set in landscaped tropical gardens with waterfall tiered swimming pools. They are overlooking Przno village and beach out to the turquoise clean waters of the Adriatic sea. The apartments are ideally located within short walking distance to Sveti Stefan and one of the Montenegro's best beaches- Queens Beach.
The most fashionable and upmarket area along the Budva Riviera - Przno's property prices are rising rapidly and faster than other parts of Montenegro. Flying time is 3 hours from the U.K. and Ireland to Dubrovnik airport (2 hours drive to Przno) or Tivat airport (20 minutes drive to Przno) or Podgorica - the capital of Montenegro (40 minutes drive to Przno).

SPECIFICATIONS
-101 luxury apartments (51 x 2 bed and 50 x 1 beds)
-Price includes allocated underground parking space for each apartment
-Visitors parking area above ground
-Walkway direct to beach/restaurants/cafes - 5 mins to beach
-Air Conditioning (including Bedrooms)
-Luxury finishes to bathrooms and kitchens
-Due for completion in September 2008
-Unspoiled Adriatic coastline and clean turquoise waters
-Green Mountain backdrop along coastline
-Sea views from all apartments
-Rental yields 5-6%
-Fastest growing tourist destination in the world
-Mediterranean climate - long summer season
-External walls insulated
-External windows & doors (double-glazed)
-Public lighting in garden & all external common areas
-Cable T.V.
-Telephone sockets
-Fully fitted kitchen including hob, oven, fridge, extractor fan
-Work surface – granite or equivalent material
-All interior doors & skirting – oak finish
-Iron mongary – stainless steel
-Main entrance door – full security
-Bathrooms – tiled floor to ceiling
-Concealed cisterns
-High quality sanitary ware
-Tiled floors throughout with high quality tiles
-Painting & decorating in white finish with all woodwork finished to a high quality in natural colour
-Stairways & common areas in marble finish or equivalent
-All hand rails – stainless steel

PAYMENT SCHEDULE:
-10% On signing contract
-30% Six weeks after starting project
-30% Twenty weeks after starting project
-30% Completion (estimated April 2009)


Permalink